In large construction and fabrication spaces, overhead/bridge cranes do the heavy lifting—literally. This long-form walkthrough shows how a full overhead crane system comes to life inside a structural building. We’ll cover rails and runway alignment—all explained in clear, real-world language.
What an Overhead/Bridge Crane Is
At heart, a bridge crane is a bridge beam that spans between two runway beams, with a trolley that travels left-right along the bridge and a hoist that lifts the load. The system delivers three axes of motion: and lift via the hoist.
You’ll find them in fabrication bays, steel plants, power stations, oil & gas shops, precast yards, and logistics hubs.
Why they matter:
Controlled moves for large, expensive equipment.
Huge efficiency gains.
Lower risk during rigging, lifting, and transport inside facilities.
High throughput with fewer ground obstructions.
System Components We’re Installing
Runways & rails: continuous beams and rail caps.
End trucks: wheel assemblies that ride the rail.
Bridge girder(s): single- or double-girder configuration.
Trolley & hoist: reeving, hook block, upper limit switches.
Electrics & controls: VFDs, radio remote, pendant.
Stops, bumpers & safety: overload protection, e-stops.
Based on design loads and bay geometry, you may be dealing with modest bmc construction shop lifts or major industrial picks. The installation flow stays similar, but the scale, lift plans, and checks grow with the tonnage.
Before the First Bolt
Good installs start on paper. Key steps:
Drawings & submittals: Approve general arrangement (GA), electrical schematics, and loads to the structure.
Permits/JSAs: Permit-to-work, hot work, working at height, rigging plans.
Runway verification: Survey columns and runway beams for straightness, elevation, and span.
Power readiness: Lockout/tagout plan for energization.
Staging & laydown: Lay out slings, shackles, spreader bars, and chokers per rigging plan.
People & roles: Brief everyone on radio calls and stop-work authority.
Millimeters at the runway become centimeters at full span. Measure twice, lift once.
Getting the Path Right
Runway alignment is the foundation. Targets and checks:
Straightness & elevation: shim packs under clips to meet tolerance.
Gauge (span) & squareness: Use feeler gauges on splice bars, torque rail clips.
End stops & buffers: Verify clearances for bumpers at both ends.
Conductor system: Mount conductor bars or festoon track parallel to the rail.
Log final numbers on the ITP sheet. Correct now or pay later in wheel wear and motor overloads.
Lifting the Bridge
Rigging plan: Choose spreader bars to keep slings clear of electricals. Dedicated signaler on radio.
Sequence:
Lift end trucks to runway level and set temporarily on blocks.
Rig the bridge girder(s) and make the main lift.
Use drift pins to align flange holes; torque to spec.
Verify camber and bridge square.
Before anyone celebrates, bump-test long-travel motors with temporary power (under permit): ensure correct rotation and brake release. Lock out after test.
The Heart of the Lift
Trolley installation: Mount wheels, align wheel flanges, set side-clearances.
Hoist reeving: Lubricate wire rope; verify dead-end terminations.
Limits & load devices: Set upper/lower limit switches.
Cross-travel adjustment: Align trolley rails on a double-girder.
Pendant/remote: Install pendant festoon or pair radio receiver; function-test deadman and two-step speed controls.
Grinding noises mean something’s off—stop and inspect. Don’t mask issues with higher VFD ramps.
Electrics & Controls
Power supply: Conductor bars with collectors or a festoon system.
Drive setup: Enable S-curve profiles for precise positioning.
Interlocks & safety: Zone limits near doors or mezzanines.
Cable management: Keep loops short, add drip loops where needed.
Commissioning crews love clean labeling and clear folders. Photos of terminations help later troubleshooting.
QA/QC & Documentation
Inspection Test Plan (ITP): Hold/witness points for rail alignment, torque, electrical polarity, limit settings.
Torque logs: Re-check after 24 hours if required.
Level & gauge reports: Note any corrective shims.
Motor rotation & phasing: Confirm brake lift timing.
Functional tests: Anti-collisions and zone interlocks.
A tidy databook speeds client acceptance.
Load Testing & Commissioning
Static load test: Hold at mid-span and near end stops; monitor deflection and brake performance.
Dynamic load test: Travel long-run, cross-travel, and hoist at rated speed with test load.
Operational checks: Limit switches trigger reliably; overload trips; horn/beacon function.
Training & handover: Operator basics, daily pre-use checks, rigging do’s & don’ts.
Only after these pass do you hand over the keys.
Applications & Use Cases
Construction & steel erection: placing beams, trusses, and precast.
Oil & gas & power: generator and turbine assembly.
Steel mills & foundries: large part transfer.
Warehousing & logistics: high throughput lanes.
Floor stays clear, production keeps flowing, and precision goes up.
Controls that Matter
Rigging discipline: rated slings & shackles, correct angles, spreader bars for load geometry.
Lockout/Tagout: clear isolation points for electrical work.
Fall protection & edges: scissor lifts and manlifts inspected.
Runway integrity: no cracked welds, correct bolt grades, proper grout.
Duty class selection: overspec when uncertainty exists.
A perfect lift is the one nobody notices because nothing went wrong.
If It Doesn’t Run Smooth
Crab angle/drift: verify end-truck wheel diameters and gearbox mounts.
Hot gearboxes: adjust brake air gap and reduce VFD decel.
Rope drum spooling: check fleet angle and sheave alignment.
Pendant lag or dropout: shield noisy VFD cables.
Wheel wear & rail pitting: add rail sweeps and check clip torque.
A 10-minute weekly check saves days of downtime later.
Fast Facts
Overhead vs. gantry? Bridge cranes ride fixed runways; gantries walk on the floor.
Single vs. double girder? Singles are lighter and cheaper; doubles carry heavier loads and give more hook height.
How long does install take? Scope, bay readiness, and tonnage rule the schedule.
What’s the duty class? FEM/ISO or CMAA classes define cycles and service—don’t guess; size it right.
What You’ll Take Away
Students and pros alike get a front-row seat to precision rigging, structural alignment, and commissioning. You’ll see how small alignment wins become big reliability wins.
Need a field bundle with JSA templates, rigging calculators, and commissioning sheets?
Get the toolkit now so your next crane goes in cleaner, faster, and right the first time. Bookmark this guide and share it with your crew.
...